Operation CHARM: Car repair manuals for everyone.

Installation





2TR-FE CHARGING: GENERATOR: INSTALLATION

1. INSTALL GENERATOR ASSEMBLY





(a) Install the generator with the 2 bolts.

Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)

(b) Connect the generator connector.





(c) Install the generator wire with the nut.

Torque : 9.8 Nm (100 kgf-cm, 7 ft-lbf)

(d) Install the terminal cap.

2. INSTALL FAN & GENERATOR V BELT Installation

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)