Operation CHARM: Car repair manuals for everyone.

Installation





1GR-FE COOLING: THERMOSTAT: INSTALLATION

1. INSTALL WATER INLET

(a) Install a new gasket onto the water inlet with thermostat.

(b) Install the water inlet with thermostat with the 3 nuts.

Torque : 9.0 Nm (92 kgf-cm, 80 in-lbf)

2. CONNECT NO.2 RADIATOR HOSE

3. CONNECT BATTERY NEGATIVE TERMINAL

Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)

4. ADD ENGINE COOLANT Service and Repair

5. CHECK FOR ENGINE COOLANT LEAKAGE Service and Repair

6. INSTALL V-BANK COVER

(a) Install the V-bank cover with the 2 nuts.

Torque : 7.5 Nm (76 kgf-cm, 66 in-lbf)