Installation
2TR-FE STARTING: STARTER: INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the starter with the 2 bolts.
Torque : 37 Nm (377 kgf-cm, 27 ft-lbf)
(b) Connect the starter connector.
(c) Install the starter wire harness with the nut.
Torque : 9.8 Nm (100 kgf-cm, 7 ft-lbf)
(d) Install the terminal cap.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)