Operation CHARM: Car repair manuals for everyone.

Installation





1GR-FE CHARGING: GENERATOR: INSTALLATION

1. INSTALL GENERATOR ASSEMBLY

(a) Install the generator assembly with the 2 bolts.

Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)

(b) Install the wire harness clamp bracket with the 2 bolts.

Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

(c) Connect the wire harness.

(1) Connect the wire harness to terminal B and install the nut.

Torque : 9.8 Nm (100 kgf-cm, 7.0 ft-lbf)

(2) Connect the connector to the generator assembly.

(3) Install the wire harness stay with the bolt.

Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

2. INSTALL FAN SHROUD Installation

3. INSTALL RADIATOR SUPPORT TO FRAME SEAL LH

4. INSTALL V-BANK COVER Installation

5. CONNECT CABLE TO NEGATIVE TERMINAL

Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)