Installation
1GR-FE EXHAUST: EXHAUST PIPE (except Regular Cab Standard Deck): INSTALLATION
1. INSTALL FRONT EXHAUST PIPE ASSEMBLY Installation
2. INSTALL FRONT NO. 2 EXHAUST PIPE ASSEMBLY
(a) Install the front No. 2 exhaust pipe to the exhaust pipe support.
(b) Install a new gasket and the front No. 2 exhaust pipe to the exhaust manifold LH with 3 new nuts.
Torque : 54 Nm (554 kgf-cm, 40 ft-lbf)
3. INSTALL CENTER EXHAUST PIPE ASSEMBLY Installation
4. INSTALL TAILPIPE ASSEMBLY Installation
5. INSTALL AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1) Installation
6. INSTALL AIR FUEL RATIO SENSOR (for Bank 2 Sensor 1) Installation
7. INSTALL HEATED OXYGEN SENSOR (for Bank 1 Sensor 2) Installation
8. INSTALL HEATED OXYGEN SENSOR (for Bank 2 Sensor 2) Installation
9. INSPECT FOR EXHAUST GAS LEAK Installation