Removal
1GR-FE EMISSION CONTROL: AIR SWITCHING VALVE (for Bank 2): REMOVAL
1. REMOVE PURGE VSV
Removal
2. REMOVE NO. 2 AIR TUBE
Remove the 2 bolts, 2 nuts and No. 2 air tube.
(a) Remove the 2 gaskets from the No. 2 air tube.
NOTICE:
Be careful not to damage the installation surface of the gaskets.
3. DISCONNECT WIRE HARNESS
Detach the 3 clamps and disconnect the wire harness.
(a) Remove the bolt and bracket.
4. REMOVE NO. 2 EMISSION CONTROL VALVE SET
Disconnect the No. 2 emission control valve set connector.
(a) Disconnect the air hose.
Remove the 3 nuts and No. 2 emission control valve set.