Removal
1UR-FE EMISSION CONTROL: AIR SWITCHING VALVE (for Bank 2): REMOVAL
1. REMOVE V-BANK COVER SUB-ASSEMBLY Removal
2. REMOVE AIR CLEANER HOSE ASSEMBLY Removal
3. DISCONNECT NO. 3 VENTILATION HOSE
Disconnect the No. 3 ventilation hose.
4. DISCONNECT NO. 1 AIR HOSE
Disconnect the No. 1 air hose.
5. REMOVE AIR SWITCHING VALVE ASSEMBLY
Disconnect the connector and clamp.
(a) Remove the bolt and disconnect the wire harness clamp bracket.
Remove the 2 bolts.
Remove the 3 bolts, air switching valve and gasket.
NOTICE:
Be careful not to damage the installation surface of the gaskets.