Operation CHARM: Car repair manuals for everyone.

Installation





1UR-FE LUBRICATION: ENGINE OIL COOLER: INSTALLATION

1. INSTALL OIL COOLER SPACER





Apply a light coat of engine oil to a new gasket.

(a) Install the gasket to the oil cooler spacer.





Install the oil cooler spacer to the oil filter bracket with the bolt.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

2. INSTALL OIL COOLER ASSEMBLY





Apply a light coat of engine oil to 2 new O-rings.

(a) Install the 2 O-rings to the oil cooler.





Install the oil cooler with the 5 nuts.

Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)

3. INSTALL OIL FILTER BRACKET





Apply a light coat of engine oil to 2 new O-rings.

(a) Install the 2 O-rings to the timing chain cover.





Install the oil filter bracket with the 2 nuts and 2 bolts.

Torque : 35 Nm (357 kgf-cm, 26 ft-lbf)

4. INSTALL NO. 1 OIL COOLER BRACKET





Connect the ground wire to the cylinder block.

(a) Install the oil cooler bracket with the 2 nuts.

Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)

5. INSTALL WATER BY-PASS PIPE Installation

6. CONNECT COOLER COMPRESSOR ASSEMBLY Installation

7. INSTALL OIL PRESSURE SENDER GAUGE ASSEMBLY Installation

8. INSTALL OIL FILTER ELEMENT Replacement

9. INSTALL FAN AND GENERATOR V BELT Installation

10. ADD ENGINE OIL Replacement

11. ADD ENGINE COOLANT Service and Repair

12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

13. INSPECT FOR OIL LEAK Replacement

14. CHECK ENGINE OIL LEVEL Testing and Inspection

15. INSPECT FOR COOLANT LEAK Testing and Inspection

16. INSTALL NO. 1 ENGINE UNDER COVER Replacement