Installation
1GR-FE COOLING: THERMOSTAT: INSTALLATION
1. INSTALL WATER INLET WITH THERMOSTAT
(a) Install a new gasket and the water inlet with thermostat with the 3 nuts.
Torque : 9.0 Nm (92 kgf-cm, 80 in-lbf)
2. CONNECT NO. 2 RADIATOR HOSE
(a) Connect the No. 2 radiator hose.
3. ADD ENGINE COOLANT Service and Repair
4. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection
5. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY Installation
6. INSTALL FRONT BUMPER COVER LOWER Installation
7. INSTALL V-BANK COVER Installation
8. INSTALL UPPER RADIATOR SUPPORT SEAL Installation