Installation
HEATING / AIR CONDITIONING: AIR CONDITIONING PANEL: INSTALLATION
1. INSTALL HEATER CONTROL ASSEMBLY
(a) Attach the 4 clips to install the heater control assembly.
2. INSTALL NO. 1 INSTRUMENT PANEL CLUSTER FINISH PANEL GARNISH Installation
3. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
(a) Attach the 5 clips to install the No. 2 instrument cluster finish panel garnish.