Secondary Air Injection Pump Relay J299, Checking






Secondary Air Injection Pump Relay J299, Checking

Special tools, testers and auxiliary items required

Multimeter.

Wiring diagram.

Test requirements

The Secondary Air Injection (AIR) Pump Relay (J299) fuses OK.

The Power Supply Relay (terminal 30, B+) (J317) fuse OK.

Battery voltage at least 12.5 V.

All electrical consumers switched off (radiator fan must NOT run during test).

A/C switched off.

The ignition switched off.

Test procedure

- Perform a preliminary check to verify the customers complaint. Refer to => [ Preliminary Check ] Preliminary Check

Start diagnosis

- Remove the Secondary Air Injection (AIR) Pump Relay (J299).

Checking voltage

- Using a Multimeter, check the Secondary Air Injection (AIR) Pump Relay (J299) socket 1/30 to Ground (GND).

Specified value: battery voltage.

If the specified value was not obtained:

- Check the wiring connections from the Battery to the Secondary Air Injection (AIR) Pump Relay (J299) socket 1/30 for an open circuit or a short circuit.

- Check the wiring connections for damage, corrosion, lose or broken terminals.

- If necessary, repair the faulty wiring connection.

If the specified value was obtained:

- Switch the ignition on.

- Using a Multimeter, check the Power Supply Relay (terminal 30, B+) (J317) socket 87 to the Secondary Air Injection (AIR) Pump Relay (J299) socket 3/85 for voltage.

Specified value: battery voltage.

- Switch the ignition off.

If the specified value was not obtained:

- Check the wiring connections from the Power Supply Relay (terminal 30, B+) (J317) socket 87 to the Secondary Air Injection (AIR) Pump Relay (J299) socket 3/85 for an open circuit or a short circuit.

- Check the wiring connections for damage, corrosion, lose or broken terminals.

- If necessary, repair the faulty wiring connection.

If the specified value was obtained:

Checking activation

- Install the Secondary Air Injection (AIR) Pump Relay (J299).

- Switch the ignition on.

- Using a Multimeter, check the Secondary Air Injection (AIR) Pump Relay (J299) socket 4/86 to Ground (GND)

- Switch the ignition off.

Specified value: battery voltage.

If the specified value was not obtained:

- Check or replace the Secondary Air Injection (AIR) Pump Relay (J299).

- Check the wiring connections for damage, corrosion, lose or broken terminals.

- If necessary, repair the faulty wiring connection.

If the specified value was obtained:

Checking wiring

If the manufacturers test box is being used. Perform the following step.

- Install the Test Box 105 Pin (VAG1598/31).

If the manufacturers test box is not being used. Perform the following step.

- Remove the Engine Control Module (ECM) (J623). Refer to => [ Engine Control Module J623, Replacing ] Engine Control Module J623, Replacing.

- Using a Multimeter, check the Secondary Air Injection (AIR) Pump Relay (J299) socket 4/86 to the Engine Control Module (ECM) (J623) electrical harness connector T121 terminal 46 for resistance.






Specified value: 1.5 ohms Max.

If the specification was not obtained:

- Check the wiring for a short circuit to each other, Battery (+), and Ground (GND).

- Check the electrical harness connector for damage, corrosion, lose or broken terminals.

- If necessary, repair the faulty wiring connection.

If no malfunction is found in the wiring and voltage supply was OK:

- Replace the Secondary Air Injection (AIR) Pump Relay (J299).

If no malfunction is found in the wiring and voltage supply was not OK:

- Erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Mode 04 - Erase DTC Memory

- Perform a road test to verify repair.

If the DTC does not return:

Repair complete, Generate readiness code. Refer to => [ Readiness Code Description ] Readiness Code Description.

- End diagnosis.

If the DTC does return and no malfunction is detected in the wiring and the voltage supply was OK:

- Replace the Engine Control Module (ECM) (J623). Refer to => [ Engine Control Module J623, Replacing ] Engine Control Module J623, Replacing.

- Assembly is performed in the reverse of the removal.

Final procedures

After repair work, the following work steps must be performed in the following sequence:

1. Check the DTC memory. Refer to => [ Diagnostic Mode 03 - Read DTC Memory ] Diagnostic Mode 03 - Read DTC Memory.

2. If necessary, erase the DTC memory. Refer to => [ Diagnostic Mode 04 - Erase DTC Memory ] Diagnostic Mode 04 - Erase DTC Memory.

3. If the DTC memory was erased, generate readiness code. Refer to => [ Readiness Code ] Monitors, Trips, Drive Cycles and Readiness Codes.

End of diagnosis