LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 1988 >> Sportvan G10, 4.3 Z, Automatic >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
G10,V6,Gas12.3A
Additional Procedure: VALVE: Grind Complete:
G10,V6,Gas, Where Air Cond interferes add,Left Side or Both0.30.3A
Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble:
Includes: Clean and replace necessary components only.
Each0.4B
Combination Procedure: ROCKER ARM STUD: Remove & Replace:
Each Additional0.2B
One0.3B
Combination Procedure: VALVE LIFTERS: Remove & Replace:
V6, All0.4B
Combination Procedure: VALVE LIFTERS (REMOVED): Clean:
Each Additional0.1B
One0.2B