Installation
P310 HYBRID BATTERY CONTROL: BATTERY BLOWER:
INSTALLATION
1. INSTALL BATTERY COOLING BLOWER ASSEMBLY
NOTE: Wear insulating gloves and protective glasses.
(a) Install the 3 battery cooling blower assemblies with the 9 nuts.
Torque: 4.5 Nm (46 kgf-cm, 40 in-lbf)
(b) Connect each battery cooling blower assembly connector and clamp.
2. INSTALL BATTERY COVER SUB-ASSEMBLY Installation
3. INSTALL BATTERY CARRIER DUCT Installation
4. INSTALL BATTERY CARRIER BRACKET Installation
5. INSTALL REAR CENTER SEAT INNER BELT Installation
6. INSTALL FLOOR CARPET ASSEMBLY FRONT Installation
7. INSTALL AIR INTAKE COVER CENTER Installation
8. INSTALL AIR INTAKE COVER Installation
9. INSTALL REAR SEAT ASSEMBLY LH Installation
10. INSTALL REAR SEAT TRACK BRACKET COVER
11. INSTALL REAR SEAT ASSEMBLY RH Installation
12. INSTALL REAR SEAT TRACK BRACKET COVER
13. INSPECT SLIDE ADJUSTER LOCK SIMULTANEOUSLY
14. INSTALL SERVICE PLUG GRIP Installation
15. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
16. PERFORM INITIALIZATION
Some systems need initialization when disconnecting the cable from the negative battery terminal. Repair Instruction - Initialization