Operation CHARM: Car repair manuals for everyone.

Up to 08/2009





2GR-FXE COOLING: RADIATOR: INSTALLATION

1. INSTALL NO. 2 RADIATOR ASSEMBLY

(a) Install the fan assembly with motor to the radiator with the 3 guides at the bottom and attach the claw.





Text in Illustration





(b) Install the 2 bolts.





Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

(c) Install the 2 lower radiator supports to the radiator, and install the radiator assembly and fan assembly with motor.





NOTICE:
Do not apply any excessive force to the cooler condenser assembly or pipe when installing the radiator assembly.

(d) Install the 4 bolts.





Torque : 6.0 Nm (61 kgf-cm, 53 in-lbf)

(e) Install the 2 radiator support cushions.





Text in Illustration





(f) Connect the 3 wire harness clamps and 2 connectors.





2. INSTALL UPPER RADIATOR SUPPORT

(a) Install the upper radiator support with the 5 bolts and connect the 3 clamps of the hood lock control cable to the upper radiator support.





Text in Illustration





Torque : 5.5 Nm (56 kgf-cm, 49 in-lbf)

3. INSTALL HOOD LOCK ASSEMBLY Installation

4. INSTALL HOOD LOCK CONTROL CABLE COVER Installation

5. INSTALL SMOG VENTILATION SENSOR (w/ Smog Ventilation Sensor) Installation

6. INSTALL LOW PITCHED HORN ASSEMBLY Installation

7. INSTALL MILLIMETER WAVE RADAR SENSOR ASSEMBLY (w/ Dynamic Radar Cruise Control System) Installation

8. CONNECT NO. 2 RADIATOR HOSE

(a) Connect the No. 2 radiator hose to the radiator.





9. CONNECT NO. 1 RADIATOR HOSE

(a) Connect the No. 1 radiator hose to the radiator.





10. INSTALL RADIATOR RESERVE TANK ASSEMBLY

(a) Connect the radiator reserve tank hose to the radiator.





(b) Install the radiator reserve tank with the bolt and connect the 2 clamps to the radiator.





Torque : 5.3 Nm (54 kgf-cm, 47 in-lbf)

11. INSTALL FRONT BUMPER ASSEMBLY Installation

12. INSTALL HOOD CUSHION CENTER Installation

13. INSTALL NO. 3 INVERTER BRACKET Installation

14. INSTALL NO. 1 AIR CLEANER INLET Installation

15. INSTALL NO. 2 AIR CLEANER INLET Installation

16. INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY Installation

17. ADD ENGINE COOLANT (for Engine) Service and Repair

18. INSPECT FOR COOLANT LEAK (for Engine) Testing and Inspection

19. INSPECT AUTOMATIC TRANSAXLE FLUID

20. INSPECT FOR OIL LEAK Replacement

21. INSTALL NO. 1 ENGINE UNDER COVER

22. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

23. INSTALL COOL AIR INTAKE DUCT SEAL Installation

24. INSTALL ENGINE ROOM SIDE COVER Installation

25. INSTALL ENGINE ROOM SIDE COVER LH Installation

26. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation

27. ADD WINDSHIELD WASHER FLUID (w/ Headlight Cleaner System) Installation

28. WARM UP ENGINE

29. PREPARE VEHICLE FOR FOG LIGHT AIM Adjustments

30. PREPARE FOR FOG LIGHT AIMING Adjustments

31. INSPECT FOG LIGHT AIMING Adjustments

32. ADJUST FOG LIGHT AIMING Adjustments

33. ADJUST MILLIMETER WAVE RADAR SENSOR (w/ Dynamic Radar Cruise Control System) Adjustments