Operation CHARM: Car repair manuals for everyone.

Installation





1UR-FE ENGINE CONTROL: ECM: INSTALLATION

1. INSTALL NO. 2 ECM BRACKET

(a) Install the No. 2 ECM bracket with the 2 screws.

Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)

2. INSTALL ECM BRACKET

(a) Install the ECM bracket with the 2 screws.

Torque : 3.0 Nm (31 kgf-cm, 27 in-lbf)

3. INSTALL ECM

(a) Install the ECM with the bolt and nut.

Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

(b) Connect the 6 ECM connectors.

4. INSTALL INSTRUMENT PANEL BOX ASSEMBLY

(a) Install the instrument panel box Installation.