Installation
2GR-FXE ENGINE CONTROL: IGNITION COIL AND SPARK PLUG: INSTALLATION
1. INSTALL SPARK PLUG
(a) Install the 6 spark plugs.
Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)
2. INSTALL IGNITION COIL ASSEMBLY
(a) Install the 6 ignition coils with the 6 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 6 ignition coil connectors.
3. INSTALL NO. 1 EGR COOLER BRACKET Installation
4. INSTALL EGR COOLER ASSEMBLY
(a) Install the EGR cooler assembly Installation.