Installation
2UR-FSE ENGINE MECHANICAL: DRIVE BELT: INSTALLATION
INSTALLATION
1. INSTALL V-RIBBED BELT
(a) Install the V-ribbed belt as shown in the illustration.
NOTE: Check that the V-ribbed belt is properly set to each pulley.
(b) Rotate the tensioner pulley counterclockwise, and then remove the bar.
(c) After installing the belt, check that it fits properly in the ribbed grooves.
(d) Check by hand to confirm that the belt has not slipped out of the grooves on the bottom of the pulley.
(e) Check that the alignment mark on the belt tensioner is within area "A".
If it is outside area "A", replace the V-ribbed belt.
HINT: When a new belt is installed, the alignment mark should be within area "B". If not, the V-ribbed belt is not installed correctly.
2. INSTALL INTAKE AIR CONNECTOR PIPE Installation
3. INSTALL NO. 1 AIR CLEANER INLET Installation
4. INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY Installation
5. INSTALL V-BANK COVER SUB-ASSEMBLY Installation