Installation
2ZR-FXE ENGINE CONTROL: ECM: INSTALLATION
1. INSTALL ECM
(a) Install the 2 ECM brackets to the ECM with the 4 screws.
(b) Install the ECM with the 2 bolts.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
(c) Connect the 2 ECM connectors.
(1) Connect the 2 ECM connectors and lower the 2 levers.
NOTICE:
* When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
* Make sure that the 2 levers are securely locked.
(2) Install the wire harness clamp.
2. INSTALL INVERTER RESERVE TANK ASSEMBLY
(a) Install the inverter reserve tank assembly with the 2 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
3. INSTALL INVERTER WITH CONVERTER ASSEMBLY
Installation
4. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
5. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE Installation
6. INSTALL DECK FLOOR BOX RH Installation
7. INSTALL REAR NO. 3 FLOOR BOARD Installation
8. INSTALL REAR DECK FLOOR BOX Installation
9. INSTALL REAR NO. 2 FLOOR BOARD Installation
10. PERFORM REGISTRATION
NOTICE:
The Vehicle Identification Number (VIN) must be input into the replacement ECM Programming and Relearning.
11. PERFORM INITIALIZATION
NOTICE:
* Perform Initialization when replacing the ECM Installation.
* When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.