Installation
2AZ-FXE LUBRICATION: OIL PRESSURE SWITCH: INSTALLATION
1. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY
(a) Apply adhesive to 2 or 3 threads of the oil pressure switch.
Text in Illustration
Adhesive:
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
(b) Using a 24 mm deep socket wrench, install the oil pressure switch.
Torque : 15 Nm (153 kgf-cm, 11 ft-lbf)
NOTICE:
Do not start the engine for at least 1 hour after installation.
(c) Connect the oil pressure switch connector.
2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
3. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
4. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY Installation
5. INSTALL COWL BODY MOUNTING REINFORCEMENT RH Installation
6. INSTALL NO. 2 HEATER AIR DUCT SPLASH SHIELD SEAL Installation
7. INSTALL WATER GUARD PLATE RH Installation
8. INSTALL FRONT WIPER MOTOR AND LINK
HINT
Installation.
9. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY Installation
10. CHECK ENGINE OIL LEVEL Testing and Inspection
11. INSPECT FOR OIL LEAK