Installation





4GR-FSE ENGINE MECHANICAL: ENGINE UNIT: INSTALLATION

1. INSTALL E.F.I. ENGINE COOLANT TEMPERATURE SENSOR

(a) Install a new gasket to the engine coolant temperature sensor.

(b) Install the temperature sensor.





Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)

2. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY

(a) Apply adhesive to 2 or 3 threads of the engine oil pressure switch assembly.





Text in Illustration





Adhesive:

Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent

(b) Using a 24 mm deep socket wrench, install the oil pressure switch.





Torque : 15 Nm (153 kgf-cm, 11 ft-lbf)

NOTICE:
To prevent oil leaks, do not start the engine within 1 hour of installation.

3. INSTALL ENGINE OIL LEVEL SENSOR

(a) Install the engine oil level sensor and a new gasket with the 4 bolts.





Torque : 7.0 Nm (71 kgf-cm, 62 in-lbf)

4. INSTALL IGNITION COIL ASSEMBLY Installation

5. INSTALL V-BANK COVER BRACKET SUB-ASSEMBLY

(a) Install the V-bank cover bracket sub-assembly with the bolt.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

6. REMOVE WIRE HARNESS CLAMP BRACKET

(a) Install the wire harness clamp bracket with the bolt.





Torque : 13 Nm (127 kgf-cm, 9 ft-lbf)

7. INSTALL FUEL INJECTOR SEAL Installation

8. INSTALL FUEL INJECTOR ASSEMBLY Installation

9. INSTALL NO. 1 FUEL DELIVERY PIPE SUB-ASSEMBLY Installation

10. INSTALL NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY Installation

11. INSTALL NO. 3 FUEL PIPE SUB-ASSEMBLY Installation

12. INSTALL NO. 2 FUEL PIPE SUB-ASSEMBLY Installation

13. INSTALL FUEL PUMP ASSEMBLY (for High Pressure) Installation

14. CONNECT NO. 2 FUEL PIPE SUB-ASSEMBLY Installation

15. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY Installation

16. INSTALL FUEL PRESSURE PULSATION DAMPER ASSEMBLY Installation

17. INSTALL INTAKE MANIFOLD Installation

18. INSTALL WATER HOSE JOINT

(a) Connect the 2 hoses, and install the water hose joint with the bolt.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

19. INSTALL NO. 2 SURGE TANK STAY

(a) Install the No. 2 surge tank stay with the bolt.

Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)

20. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation

21. INSTALL THROTTLE BODY Installation

22. INSTALL INJECTOR DRIVER

(a) Install the injector driver with the bolt and 2 nuts.





Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)

23. INSTALL ENGINE WIRE

(a) Install the engine wire to the engine assembly.

24. INSTALL WATER PUMP PULLEY Installation

25. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

(a) Temporarily install the V-ribbed belt tensioner with the 5 bolts.





Each bolt length is as follows:





(b) Install the V-ribbed belt tensioner by tightening the bolt 1 and bolt 2 in the order shown in the illustration.

Torque : 43 Nm (439 kgf-cm, 32 ft-lbf)

(c) Tighten the other bolts.

Torque : 43 Nm (439 kgf-cm, 32 ft-lbf)

26. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH

(a) Install the front No. 1 engine mounting bracket LH with the 4 bolts.





Torque : 43 Nm (439 kgf-cm, 32 ft-lbf)

(b) Connect the 2 clamps.

27. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH

(a) Install the front No. 1 engine mounting bracket RH with the 4 bolts.





Torque : 43 Nm (439 kgf-cm, 32 ft-lbf)

28. INSTALL COMPRESSOR AND MAGNETIC CLUTCH Installation

29. INSTALL GENERATOR ASSEMBLY Installation

30. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY

(a) Install the plate and No. 2 idler pulley sub-assembly with the bolt.





Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)

31. INSTALL NO. 1 ENGINE COVER

(a) Install the No. 1 engine cover with the 3 clips.





32. INSTALL NO. 2 ENGINE COVER

(a) Install the No. 2 engine cover with the 3 clips.





(b) Connect the clamp.

33. INSTALL V-RIBBED BELT Installation

34. INSTALL ENGINE HANGERS

(a) Install the 2 engine hangers with the 4 bolts.





Text in Illustration





Torque : 33 Nm (336 kgf-cm, 24 ft-lbf)

Part No.