Installation
2UR-GSE LUBRICATION: OIL PUMP: INSTALLATION
1. INSTALL SCAVENGING PUMP ASSEMBLY Installation
2. INSTALL NO. 3 OIL PIPE Installation
3. INSTALL NO. 2 OIL PIPE Installation
4. INSTALL NO. 1 OIL PIPE Installation
5. INSTALL INLET WATER PIPE
(a) Apply soapy water to 2 new O-rings and install them to the inlet water pipe.
(b) Install the inlet pipe to the heat exchanger assembly.
6. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY
(a) Remove any old packing material remaining on the sealing surfaces before applying seal packing.
(b) Clean and degrease the contact surfaces of the timing chain cover, cylinder head, and cylinder block and confirm that no oil, moisture, or other foreign matter remains on the surfaces.
(c) Install a new oil pump gasket.
(d) Install a new O-ring.
(e) Apply seal packing in a continuous line to the timing chain cover as shown in the illustration.
Seal packing:
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
*
Apply seal packing as follows:
NOTICE:
* When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.
* Install the chain cover within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
* Do not add engine oil for at least 2 hours after installing the chain cover.
* Do not start the engine for at least 2 hours after installing the chain cover.
(f) Align the oil pump drive rotor spline and the crankshaft as shown in the illustration. Install the spline and chain cover to the crankshaft.
(g) Temporarily install the timing chain cover with the 30 bolts and nut.
Bolt Length:
NOTICE:
Make sure that there is no oil on the bolt threads.
(h) Tighten the 11 bolts in several steps, in the sequence shown in the illustration.
Torque : 47 Nm (479 kgf-cm, 35 ft-lbf)
(i) Temporarily install the belt tensioner with the standard bolt and hexagon bolt.
(j) Tighten the 21 bolts and nut in several steps, in the sequence shown in the illustration.
HINT
Use a 6 mm socket hexagon wrench to tighten the bolt numbered 22 in the illustration.
Torque : 23 Nm (235 kgf-cm, 17 ft-lbf)
(k) After the installation, if the seal packing has seeped out at the areas labeled A shown in the illustration, wipe it off.
7. INSTALL CAMSHAFT TIMING CONTROL MOTOR ASSEMBLY LH (for Bank 1) Reassembly
8. INSTALL CAMSHAFT TIMING CONTROL MOTOR ASSEMBLY RH (for Bank 2) Reassembly
9. INSTALL SPARK PLUG TUBE GASKET Reassembly
10. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH (for Bank 1) Reassembly
11. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY (for Bank 2) Reassembly
12. INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL Installation
13. INSTALL CRANKSHAFT TIMING GEAR KEY Installation
14. INSTALL CRANKSHAFT PULLEY Installation
15. INSTALL OIL FILTER BRACKET SUB-ASSEMBLY
(a) Install 2 new gaskets to the oil filter bracket sub-assembly.
(b) Install the oil filter bracket sub-assembly with the 2 bolts and 2 nuts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(c) Install the oil filter bracket stay with the 2 bolts.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
16. INSTALL FRONT WATER BY-PASS JOINT Reassembly
17. INSTALL NO. 3 V-BANK COVER BRACKET SUB-ASSEMBLY Installation
18. INSTALL NO. 4 V-BANK COVER BRACKET SUB-ASSEMBLY Installation
19. INSTALL IGNITION COIL ASSEMBLY Installation
20. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY Installation
21. INSTALL WATER INLET HOUSING Installation
22. CONNECT NO. 3 WATER BY-PASS HOSE Installation
23. CONNECT WATER INLET HOSE Installation
24. CONNECT NO. 5 WATER BY-PASS HOSE Installation
25. CONNECT NO. 2 RADIATOR HOSE Installation
26. INSTALL WATER PUMP PULLEY Installation
27. INSTALL OIL PUMP DRIVE SHAFT PULLEY
(a) Temporarily install the oil pump drive shaft pulley with the 4 bolts.
(b) Using SST, hold the oil pump drive shaft pulley and tighten the 4 bolts.
SST : 09960-10010
09962-01000
09963-00600
Torque : 23 Nm (235 kgf-cm, 17 ft-lbf)
28. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY Installation
29. INSTALL GENERATOR ASSEMBLY Installation
30. INSTALL COMPRESSOR AND PULLEY Installation
31. CONNECT DISCHARGE HOSE SUB-ASSEMBLY Installation
32. CONNECT NO. 1 COOLER REFRIGERANT SUCTION HOSE Installation
33. INSTALL V-RIBBED BELT Installation
34. INSTALL FUEL PUMP SPACER Installation
35. INSTALL FUEL PUMP ASSEMBLY (for Bank 1)
Installation
36. INSTALL FUEL PUMP ASSEMBLY (for Bank 2)
Installation
37. CONNECT WIRE HARNESS
(a) Connect the ground wire with the bolt and clamp.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
(b) Connect the ground cable with the bolt.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(c) Connect the 7 clamps and connect the 5 connectors.
(d) Install the 2 ground wires with the 2 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(e) Connect the 3 clamps and 8 connectors.
(f) Connect the 5 connectors and grommet to the engine room ECU box.
(g) Engage the claw and connect the No. 4 connector holder to the engine room ECU box.
(h) Connect the 3 connectors and connector clamp.
38. INSTALL ENGINE ROOM ECU COVER Installation
39. INSTALL WIRE HARNESS CLAMP BRACKET Installation
40. INSTALL BATTERY TRAY Installation
41. INSTALL POWER STEERING ECU ASSEMBLY Installation
42. INSTALL NO. 1 BATTERY TRAY SUPPORT
43. INSTALL BATTERY Installation
44. INSTALL RADIATOR ASSEMBLY
Installation
45. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
46. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
47. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
48. ADD ENGINE OIL Replacement
49. ADD ENGINE COOLANT Service and Repair
50. ADD AUTOMATIC TRANSMISSION FLUID Installation
51. CHARGE REFRIGERANT Service and Repair
52. INSPECT FOR OIL LEAK
53. INSPECT FOR COOLANT LEAK Testing and Inspection
54. INSPECT FOR FUEL LEAK Fuel System
55. INSPECT FOR REFRIGERANT LEAK Service and Repair
56. INSTALL NO. 2 ENGINE UNDER COVER
57. INSTALL ENGINE UNDER COVER
58. INSTALL NO. 1 AIR CLEANER INLET Installation
59. INSTALL ENGINE ROOM SIDE COVER RH Installation
60. INSTALL ENGINE ROOM SIDE COVER LH Installation
61. INSTALL COOL AIR INTAKE DUCT SEAL Installation
62. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
63. ADJUST MILLIMETER WAVE RADAR SENSOR ASSEMBLY (w/ Dynamic Radar Cruise Control System) Adjustments
64. VEHICLE PREPARATION FOR FOG LIGHT AIMING Adjustments
65. PREPARATION FOR FOG LIGHT AIMING Adjustments
66. INSPECT FOG LIGHT AIMING Adjustments
67. ADJUST FOG LIGHT ASSEMBLY Adjustments