Installation
3MZ-FE ENGINE CONTROL SYSTEM: VVT SENSOR: INSTALLATION
INSTALLATION
1. INSTALL VVT SENSOR (for Bank 1)
(a) Apply a light coat of engine oil to the O-ring on the VVT sensor.
(b) Install the VVT sensor with the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(c) Connect the VVT sensor connector.
2. INSTALL VVT SENSOR (for Bank 2)
(a) Apply a light coat of engine oil to the O-ring on the VVT sensor.
(b) Install the VVT sensor with the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(c) Connect the VVT sensor connector.
(d) Install the heated oxygen sensor connector (Bank 2) to the wire harness bracket.
3. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation
4. INSTALL NO. 2 ENGINE ROOM SIDE COVER LH Installation
5. INSTALL COOL AIR INTAKE DUCT SEAL Installation