Installation
1GR-FE ENGINE CONTROL SYSTEM: VVT SENSOR: INSTALLATION
INSTALLATION
1. INSTALL VVT SENSOR
(a) LH bank side VVT sensor.
(1) Apply a light coat of engine oil to an O-ring of the VVT sensor.
(2) Install the VVT sensor with the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(3) Connect the VVT sensor connector.
(4) Connect the water by-pass hoses No. 4 and No. 5.
(b) RH bank side VVT sensor.
(1) Apply a light coat of engine oil to an O-ring of the VVT sensor.
(2) Install the VVT sensor with the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(3) Connect the VVT sensor connector.
2. INSTALL AIR CLEANER ASSEMBLY Installation
3. CONNECT VENTILATION HOSE NO.2
4. ADD ENGINE COOLANT Service and Repair
5. CHECK FOR ENGINE COOLANT LEAKS Service and Repair
6. INSTALL V-BANK COVER
(a) Install the V-bank cover with the 2 nuts.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)