Operation CHARM: Car repair manuals for everyone.

Installation








1GR-FE ENGINE CONTROL SYSTEM: VVT SENSOR: INSTALLATION

INSTALLATION

1. INSTALL VVT SENSOR
(a) LH bank side VVT sensor:
(1) Apply a light coat of engine oil to the O-ring of the VVT sensor.
(2) Install the VVT sensor with the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(3) Connect the VVT sensor connector.
(4) Connect the water by-pass hoses No. 4 and No. 5.
(b) RH bank side VVT sensor:
(1) Apply a light coat of engine oil to the O-ring of the VVT sensor.
(2) Install the VVT sensor with the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(3) Connect the VVT sensor connector.
2. INSTALL AIR CLEANER ASSEMBLY Installation
3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 Nm (40 kgf-cm, 35 in-lbf)
4. ADD ENGINE COOLANT Service and Repair
5. CHECK FOR ENGINE COOLANT LEAKAGE Service and Repair
6. INSTALL V-BANK COVER
(a) Install the V-bank cover with the 2 nuts.
Torque: 7.5 Nm (76 kgf-cm, 66 in-lbf)