Installation
2GR-FXE ENGINE CONTROL SYSTEM: ECM: INSTALLATION
1. INSTALL ECM
(a) Set the ECM in the engine room ECM box.
(b) Install the engine room ECM cover with the 3 claws.
(c) Install the No. 1 ECM bracket and No. 2 ECM bracket with the 4 bolts.
Torque : 4.5 Nm (46 kgf-cm, 40 in-lbf)
(d) Install the wire harness bracket with the 2 bolts.
Torque : 8.5 Nm (87 kgf-cm, 75 in-lbf)
(e) Install the ECM with bracket with the 3 bolts.
for bolt A - Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)
for bolt B - Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)
Text in Illustration
(f) Attach the clamp and connect the cooler pipe.
(g) Connect the 3 wire harness clamps.
(h) Connect the 2 ECM connectors and wire harness clamp.
NOTICE:
* When connecting the connectors, make sure that dirt, water or other foreign matter does not become stuck between the connectors and other parts.
* Make sure that the 2 levers are securely locked.
2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
3. INSTALL BATTERY SERVICE HOLE COVER ASSEMBLY Installation
4. INSTALL DECK BOARD ASSEMBLY Installation
5. PERFORM INITIALIZATION
HINT
Initialization cannot be completed by only disconnecting and reconnecting the cable of the negative (-) battery terminal.
(a) Perform initialization when replacing the ECM Installation.