Installation
3UR-FE ENGINE CONTROL: IGNITION COIL AND SPARK PLUG: INSTALLATION
1. INSTALL SPARK PLUG
(a) Install the 8 spark plugs.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
2. INSTALL IGNITION COIL ASSEMBLY
(a) Install the 8 ignition coils with the 8 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 8 ignition coil connectors.
3. CONNECT WATER BY-PASS PIPE ASSEMBLY
(a) Connect the water by-pass pipe to the cylinder head cover and automatic transmission with the 3 bolts.
Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)
(b) Connect the water by-pass pipe to the cylinder head cover and timing chain cover with the 2 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
4. INSTALL AIR CLEANER ASSEMBLY Installation
5. INSTALL AIR CLEANER HOSE ASSEMBLY Installation
6. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
7. INSTALL NO. 2 ENGINE UNDER COVER Installation