Installation
1UR-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALLATION
1. REMOVE ENGINE FROM ENGINE STAND
(a) Install the 2 engine hangers with the 2 bolts as shown in the illustration.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
HINT
(b) Attach an engine sling device and hang the engine with a chain block.
(c) Remove the bolts and engine assembly from the engine stand.
2. INSTALL ENGINE ASSEMBLY
(a) Slowly lower the engine assembly into the engine compartment.
NOTICE:
Make sure that the engine is clear of all wiring and hoses.
(b) Attach the engine mounting insulators to the vehicle.
(c) Install the 4 engine mounting insulator bolts.
Torque : 79 Nm (806 kgf-cm, 58 ft-lbf)
(d) Remove the 2 bolts and 2 engine hangers.
3. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY
(a) Using SST, hold the crankshaft.
SST : 09213-70011
SST : 09330-00021
(b) Install the crankshaft angle sensor rotor.
HINT
Align the pin hole of the crankshaft angle sensor rotor with the pin of the crankshaft.
(c) Install the drive plate and rear drive plate spacer onto the crankshaft.
(d) Apply adhesive to 2 or 3 threads of the 8 bolts.
Adhesive:
Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
(e) Install and uniformly tighten 10 new bolts in the sequence shown in the illustration.
Torque : 30 Nm (301 kgf-cm, 22 ft-lbf)
NOTICE:
* Do not reuse the drive plate installation bolts.
* Do not strike or damage the drive plate installation bolts. Be sure to handle them carefully.
(f) Mark the top of each drive plate installation bolt with paint.
(g) Tighten the drive plate installation bolts 90° as shown in the illustration.
(h) Check that the painted marks are now at a 90° angle to the top.
4. INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR (for 4WD)
5. INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR (for 2WD)
6. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY
(a) for 2WD:
Refer to the following procedures .
(b) for 4WD:
Refer to the following procedures Installation.
7. INSTALL STARTER ASSEMBLY Installation
8. INSTALL STARTER COVER Installation
9. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH Installation
10. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR Installation
11. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH Installation
12. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR Installation
13. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY Installation
14. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE Installation
15. CONNECT NO. 1 WATER BY-PASS PIPE
(a) Connect the No. 1 water by-pass pipe with the 3 bolts.
Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)
16. INSTALL EXHAUST PIPE ASSEMBLY
(a) Install the exhaust pipe Installation.
17. INSTALL FRONT PROPELLER SHAFT ASSEMBLY (for 4WD)
(a) Install the front propeller shaft Installation.
18. INSTALL PROPELLER SHAFT ASSEMBLY
(a) for 2WD:
Refer to the following procedures Installation.
(b) for 4WD:
Refer to the following procedures Installation.
19. INSTALL GENERATOR ASSEMBLY Installation
20. CONNECT VANE PUMP ASSEMBLY Installation
21. CONNECT COOLER COMPRESSOR ASSEMBLY Installation
22. CONNECT WIRE HARNESS AND HOSE
(a) Connect the 2 connectors and 2 clips to the engine room junction block.
(b) Install the engine wire with the nut. Then connect the 2 clips.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(c) Connect the 4 air injection control driver connectors.
(d) Install the ground wire with the bolt.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(e) Connect the cable to the positive (+) battery terminal.
(f) Install the wire to the positive (+) battery cable with the nut.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
(g) Connect the air injection system hose.
(h) Install the connector bracket with the nut.
Torque : 6.0 Nm (61 kgf-cm, 53 in-lbf)
(i) Connect the 2 clamps and air pump connector.
(j) Connect the clamp and ground wire with the bolt.
Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)
(k) Connect the 4 connectors to the connector holder block.
(l) Connect the 2 heater hoses.
(m) Connect the No. 4 water by-pass hose.
(n) Connect the ECM connector and clamp.
HINT
Refer to the following procedures to connect the ECM connector Installation.
23. CONNECT NO. 2 FUEL TUBE SUB-ASSEMBLY
(a) Connect the No. 2 fuel tube Service Precautions.
24. CONNECT NO. 1 FUEL PIPE SUB-ASSEMBLY
(a) Connect the No. 1 fuel pipe Service Precautions.
(b) Install the fuel pipe clamp.
25. INSTALL INTAKE MANIFOLD Installation
26. INSTALL AIR TUBE SUB-ASSEMBLY LH Installation
27. INSTALL VENTILATION HOSE ASSEMBLY Installation
28. INSTALL EGR VALVE BRACKET Installation
29. INSTALL EGR VALVE ASSEMBLY Installation
30. CONNECT NO. 13 WATER BY-PASS HOSE Installation
31. CONNECT NO. 12 WATER BY-PASS HOSE Installation
32. INSTALL RADIATOR ASSEMBLY Installation
33. INSTALL NO. 1 RADIATOR TO SUPPORT SEAL (for RH Side) Installation
34. INSTALL NO. 1 RADIATOR TO SUPPORT SEAL (for LH Side) Installation
35. INSTALL FAN SHROUD Installation
36. INSTALL FAN AND GENERATOR V BELT Installation
37. INSTALL RADIATOR SIDE DEFLECTOR LH Installation
38. INSTALL RADIATOR SIDE DEFLECTOR RH Installation
39. CONNECT OUTLET RADIATOR HOSE Installation
40. INSTALL INLET RADIATOR HOSE Installation
41. INSTALL FRONT BUMPER COVER
(a) Install the front bumper cover Installation.
42. INSTALL FRONT FENDER APRON SEAL REAR LH Installation
43. INSTALL FRONT FENDER APRON SEAL LH Installation
44. INSTALL FRONT FENDER APRON SEAL REAR RH Installation
45. INSTALL FRONT FENDER APRON SEAL RH Installation
46. INSTALL COWL TOP OUTER PANEL SUB-ASSEMBLY Installation
47. INSTALL AIR CLEANER ASSEMBLY
(a) Install the air cleaner case with the 2 bolts.
Torque : 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Install the air cleaner element to the air cleaner case.
(c) Install the air cleaner cap.
(1) Install the air cleaner cap and fasten the 4 hook clamps.
(2) Connect the MAF meter connector.
(3) Attach the wire harness clamp.
48. INSTALL AIR CLEANER HOSE ASSEMBLY
(a) Install the air cleaner hose with the 2 clamps.
Torque : 4.0 Nm (41 kgf-cm, 35 in-lbf)
(b) Connect the ventilation hose and vacuum sensing hose.
49. ADD ENGINE OIL Replacement
50. ADD ENGINE COOLANT Service and Repair
51. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
52. INSPECT FOR OIL LEAK Replacement
53. INSPECT FOR COOLANT LEAK Testing and Inspection
54. INSPECT FOR EXHAUST GAS LEAK Installation
55. INSPECT FOR FUEL LEAK Installation
56. INSPECT SHIFT LEVER POSITION
(a) Inspect the shift lever position .
57. INSTALL V-BANK COVER SUB-ASSEMBLY
(a) Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover to attach the pins.
58. INSTALL HOOD SUB-ASSEMBLY
(a) Install the hood with the 4 bolts.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
(b) Attach the lower part of the 2 hood supports to the hood support bolt ball joints.
CAUTION:
Install the hood support while supporting the hood by hand.
(c) Attach the hood support clips.
NOTICE:
Check that the hood support is engaged in the ball joint and that it cannot be pulled out.
59. ADJUST HOOD SUB-ASSEMBLY Adjustments
60. INSTALL NO. 1 ENGINE UNDER COVER Replacement
61. INSTALL FRONT WIPER MOTOR AND LINK ASSEMBLY
(a) Install the front wiper motor and link Installation.
62. INSPECT IGNITION TIMING Engine
63. INSPECT ENGINE IDLE SPEED Engine
64. INSPECT CO/HC Engine
65. CHECK ENGINE OIL LEVEL Testing and Inspection
66. CHECK ENGINE COOLANT LEVEL Testing and Inspection