Installation
2GR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the wire harness clamp stay with the bolt.
Torque : 8.4 Nm (85 kgf-cm, 74 in-lbf)
(b) Connect the wire harness clamp.
(c) Install the generator assembly to the cylinder block sub-assembly with the generator bracket, bolt and nut.
Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)
(d) Install the 2 bolts.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
(e) Connect the generator connector to the generator assembly.
(f) Install the generator wire with the nut.
Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)
(g) Install the terminal cap.
(h) Connect the 3 wire harness clamps.
(i) Connect the magnetic clutch connector to the compressor and magnetic clutch.
2. INSTALL FAN & GENERATOR V BELT
Installation
3. INSTALL RADIATOR ASSEMBLY WITH FAN SHROUD AND FAN MOTOR
Installation
4. INSTALL FRONT BUMPER ASSEMBLY
Installation
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.