Installation
3UR-FE ENGINE CONTROL SYSTEM: VVT SENSOR: INSTALLATION
1. INSTALL VVT SENSOR
(a) Install the 4 sensors with the 4 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 4 sensor connectors.
2. INSTALL AIR CLEANER HOSE ASSEMBLY Installation
3. INSTALL V-BANK COVER SUB-ASSEMBLY Installation