Installation
1GR-FE ENGINE MECHANICAL: ENGINE UNIT: INSTALLATION
1. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH
(a) Install the front No. 1 engine mounting bracket RH with the 4 bolts.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
2. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH
(a) Install the front No. 1 engine mounting bracket LH with the 3 bolts.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
3. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE Installation
4. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY Installation
5. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY Installation
6. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY Installation
7. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY Installation
8. INSTALL INTAKE MANIFOLD Installation
9. INSTALL FUEL INJECTOR ASSEMBLY Installation
10. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY Installation
11. INSTALL FUEL PIPE SUB-ASSEMBLY
(a) Install the fuel pipe with the 2 bolts.
Torque : 9.0 Nm (92 kgf-cm, 80 in-lbf)
(b) Connect the 2 fuel pipes Service Precautions.
12. INSTALL REAR CYLINDER HEAD COVER Installation
13. INSTALL IGNITION COIL ASSEMBLY
(a) Install the 6 ignition coils with the 6 bolts.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
14. INSTALL HEATER WATER HOSE ASSEMBLY
(a) Install the heater water hose assembly and connect the 2 hoses.
15. INSTALL ENGINE WIRE