Operation CHARM: Car repair manuals for everyone.

Removal





1UR-FE EMISSION CONTROL: AIR SWITCHING VALVE (for Bank 1): REMOVAL

1. REMOVE V-BANK COVER SUB-ASSEMBLY Removal

2. REMOVE ENGINE ROOM SIDE COVER LH Removal

3. DISCONNECT NO. 2 AIR INJECTION SYSTEM HOSE





(a) Disconnect the air switching valve connector.

(b) Disconnect the No. 2 air injection system hose.

4. REMOVE AIR SWITCHING VALVE ASSEMBLY





(a) Remove the bolt and disconnect the wire harness clamp bracket.





(b) Remove the 2 bolts.





(c) Remove the 3 bolts, air switching valve and gasket.

NOTICE:
Be careful not to damage the surfaces that contact the gasket.