Operation CHARM: Car repair manuals for everyone.

Removal





2UR-GSE ENGINE CONTROL: THROTTLE BODY: REMOVAL

1. REMOVE ENGINE UNDER COVER

2. DRAIN ENGINE COOLANT Service and Repair

3. REMOVE V-BANK COVER SUB-ASSEMBLY Removal

4. REMOVE AIR CLEANER CAP SUB-ASSEMBLY

(a) Loosen the 2 hose clamps and separate the 2 ventilation hoses.





(b) Disconnect the mass air flow meter connector and separate the wire harness clamp.





(c) Loosen the hose clamp and separate the air cleaner hose.





(d) Unlock the 2 clamps and remove the air cleaner cap sub-assembly.





5. REMOVE THROTTLE BODY ASSEMBLY

(a) Disconnect the throttle body connector.





(b) Loosen the hose clamp and separate the No. 5 water by-pass hose.





(c) Loosen the hose clamp and separate the No. 4 water by-pass hose.





(d) Remove the 2 bolts and 2 nuts.





(e) Using a "TORX" socket E6, remove the 2 stud bolts and throttle body assembly.





NOTICE:
Do not damage the water hoses when removing the throttle body assembly.

(f) Remove the 2 water by-pass hoses.