Removal
2UR-GSE ENGINE CONTROL: THROTTLE BODY: REMOVAL
1. REMOVE ENGINE UNDER COVER
2. DRAIN ENGINE COOLANT Service and Repair
3. REMOVE V-BANK COVER SUB-ASSEMBLY Removal
4. REMOVE AIR CLEANER CAP SUB-ASSEMBLY
(a) Loosen the 2 hose clamps and separate the 2 ventilation hoses.
(b) Disconnect the mass air flow meter connector and separate the wire harness clamp.
(c) Loosen the hose clamp and separate the air cleaner hose.
(d) Unlock the 2 clamps and remove the air cleaner cap sub-assembly.
5. REMOVE THROTTLE BODY ASSEMBLY
(a) Disconnect the throttle body connector.
(b) Loosen the hose clamp and separate the No. 5 water by-pass hose.
(c) Loosen the hose clamp and separate the No. 4 water by-pass hose.
(d) Remove the 2 bolts and 2 nuts.
(e) Using a "TORX" socket E6, remove the 2 stud bolts and throttle body assembly.
NOTICE:
Do not damage the water hoses when removing the throttle body assembly.
(f) Remove the 2 water by-pass hoses.