Operation CHARM: Car repair manuals for everyone.

Installation








1GR-FE CHARGING: GENERATOR: INSTALLATION

INSTALLATION

1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator assembly with the 2 bolts.
Torque: 43 Nm (438 kgf-cm, 32 ft-lbf)
(b) Install the wire harness clamp bracket with the 2 bolts.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)
(c) Connect the wire harness.
(1) Connect the wire harness to the terminal B and install the nut.
Torque: 9.8 Nm (100 kgf-cm, 7 ft-lbf)
(2) Connect the connector to the generator assembly.
(3) Install the wire harness stay with the bolt.
Torque: 8.0 Nm (82 kgf-cm, 71 in-lbf)

2. INSTALL BATTERY
3. INSTALL FAN AND GENERATOR V BELT Installation
4. INSTALL ENGINE NO. 1 UNDER COVER SUB-ASSEMBLY
(a) Install the engine under cover sub-assembly No. 1 with the 4 bolts.
Torque: 29 Nm (296 kgf-cm, 21 ft-lbf)

5. INSTALL V-BANK COVER Installation