Installation
3UR-FE BATTERY / CHARGING: GENERATOR: INSTALLATION
1. INSTALL GENERATOR ASSEMBLY
(a) Install the stud bolt.
Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Install the generator with the 3 bolts and nut.
Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)
(c) Connect the generator connector.
(d) Connect the generator wire with the nut.
Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)
(e) Install the terminal cap.
(f) Install the harness bracket to the generator with the bolt.
Torque : 31 Nm (316 kgf-cm, 23 ft-lbf)
2. CONNECT OIL COOLER PIPE ASSEMBLY Installation
3. CONNECT VANE PUMP ASSEMBLY Installation
4. INSTALL FRONT FENDER APRON SEAL FRONT RH Installation
5. INSTALL FAN & GENERATOR V BELT Installation
6. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY Installation
7. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH Installation
8. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH Installation
9. INSTALL AIR CLEANER ASSEMBLY Installation
10. INSTALL AIR CLEANER HOSE ASSEMBLY Installation
11. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL