Operation CHARM: Car repair manuals for everyone.

Installation





1AR-FE ENGINE MECHANICAL: CYLINDER HEAD GASKET: INSTALLATION

1. INSPECT CYLINDER HEAD BOLT Engine Unit

2. INSPECT CYLINDER HEAD SUB-ASSEMBLY Testing and Inspection

3. INSTALL CYLINDER HEAD GASKET





(a) Clean the cylinder block and cylinder head with solvent.

Text in Illustration





(b) Apply a continuous line of seal packing to a new cylinder head gasket as shown in the illustration.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

Standard seal dimension:

3.0 to 7.0 mm (0.118 to 0.276 in.) wide and 3.0 mm (0.118 in.) thick

HINT
Apply at least 20 mm (0.787 in.) of seal packing from the inside edge of the protrusion of the cylinder block.

NOTICE:
* Remove any oil from the contact surface.
* Install the cylinder head gasket within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.

(c) Place a new cylinder head gasket on the cylinder block surface with the front face of the Lot No. stamp upward.

NOTICE:
Pay attention to the installation direction.

4. INSTALL CYLINDER HEAD SUB-ASSEMBLY

HINT
The cylinder head bolts are tightened in 4 progressive steps.

(a) Place the cylinder head on the cylinder block.

NOTICE:
* Ensure that no oil is on the mounting surface of the cylinder head.
* Place the cylinder head on the cylinder block gently in order not to damage the gasket with the bottom part of the head.

(b) Install the plate washers to the cylinder head bolts.

(c) Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.

(d) Step 1:

(1) Using a 10 mm bi-hexagon wrench, install and uniformly tighten the 10 cylinder head bolts in several steps, in the sequence shown in the illustration.





Torque : 36 Nm (367 kgf-cm, 27 ft-lbf)

NOTICE:
Do not drop the plate washer for the cylinder head bolt into the cylinder head.

(e) Step 2:

(1) Tighten the cylinder head bolts again in the sequence shown in the illustration to make sure that they are tightened to the specified torque.

Torque : 36 Nm (367 kgf-cm, 27 ft-lbf)

(f) Step 3:

(1) Mark each cylinder head bolt head with paint as shown in the illustration.





Text in Illustration





(2) Tighten the cylinder head bolts 90° in the sequence shown in step 1.

(g) Step 4:

(1) Tighten the cylinder head bolts another 90° in the sequence shown in step 1.

(2) Check that the painted marks are now facing rearward.

NOTICE:
* Do not apply oil for at least 4 hours after the installation.
* Do not start the engine for at least 4 hours after the installation.
* After the installation, if the seal packing has seeped out, wipe it off.

5. INSTALL VALVE STEM CAP

(a) Apply a light coat of engine oil to the valve stem ends.

(b) Install the 16 valve stem caps to the cylinder head.

NOTICE:
Do not drop the valve stem caps into the cylinder head.

6. SET CAMSHAFT TIMING GEAR ASSEMBLY Installation

7. INSTALL VALVE LASH ADJUSTER ASSEMBLY Installation

8. INSTALL NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY Installation

9. INSTALL NO. 2 CAMSHAFT BEARING Reassembly

10. INSTALL NO. 1 CAMSHAFT BEARING Reassembly

11. INSTALL OIL CONTROL VALVE FILTER Reassembly

12. INSTALL CAMSHAFT Installation

13. INSTALL CAMSHAFT BEARING CAP Installation

14. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY Installation

15. INSTALL CAMSHAFT TIMING GEAR ASSEMBLY Installation

16. INSTALL CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY Installation

17. ADD ENGINE OIL Installation

18. SET NO. 1 CYLINDER TO TDC / COMPRESSION Installation

19. INSTALL NO. 1 CHAIN VIBRATION DAMPER Installation

20. INSTALL CHAIN SUB-ASSEMBLY Installation

21. INSTALL CHAIN TENSIONER SLIPPER Installation

22. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY

23. INSTALL TIMING CHAIN GUIDE Installation

24. CHECK NO. 1 CYLINDER TO TDC / COMPRESSION Installation

25. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY Installation

26. INSTALL ENGINE MOUNTING BRACKET RH Installation

27. INSTALL TIMING CHAIN COVER OIL SEAL Installation

28. INSTALL CRANKSHAFT PULLEY Reassembly

29. INSTALL CRANKSHAFT POSITION SENSOR Installation

30. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY Reassembly

31. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY Reassembly

32. INSTALL IGNITION COIL ASSEMBLY Installation

33. INSTALL FUEL INJECTOR ASSEMBLY Installation

34. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY Installation

35. INSTALL INTAKE MANIFOLD Installation

36. INSTALL UNION TO CONNECTOR TUBE HOSE Installation

37. CONNECT VACUUM SWITCHING VALVE HOSE ASSEMBLY Installation

38. INSTALL NO. 2 FUEL VAPOR FEED HOSE ASSEMBLY Installation

39. INSTALL EXHAUST MANIFOLD TO HEAD GASKET Installation

40. INSTALL EXHAUST MANIFOLD Installation

41. INSTALL NO. 2 MANIFOLD STAY Installation

42. INSTALL MANIFOLD STAY Installation

43. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE

Installation