Operation CHARM: Car repair manuals for everyone.

Installation





1GR-FE LUBRICATION: OIL PUMP (for 4WD and Pre-Runner): INSTALLATION

1. INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL Replacement

2. INSTALL TIMING CHAIN OR BELT COVER SUB-ASSEMBLY

(a) Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head and cylinder block.

(b) Install a new O-ring onto the LH cylinder head as shown in the illustration.





(c) Apply continuous beads of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the 4 locations shown in the illustration.





Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

(d) Apply continuous beads of seal packing (diameter 3 to 4 mm (0.12 to 0.16 in.)) to the timing chain cover as shown in the illustration.





Seal packing:

Water pump part
Toyota Genuine Seal Packing 1282B, Three Bond 1282B or equivalent

Other parts
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

NOTICE:
* Install the timing chain cover within 3 minutes after applying seal packing. Timing chain cover bolts and nuts must be tightened within 15 minutes of installation. Otherwise the seal packing must be removed and reapplied.
* Do not apply seal packing to portion A shown in the illustration.

(e) Align the key way of the oil pump drive rotor with the rectangular portion of the crankshaft timing gear, and slide the timing chain cover into place.





(f) Install the timing chain cover with the 24 bolts and 2 nuts. Tighten the bolts and nuts uniformly in several steps.





Torque : 23 Nm (235 kgf-cm, 17 ft-lbf)

NOTICE:
Pay attention not to wrap the chain and slipper over the timing chain cover seal line.

Each bolt length is as follows:





3. INSTALL OIL FILTER BRACKET SUB-ASSEMBLY

(a) Install a new gasket and oil filter bracket with the 3 bolts and 2 nuts.

Torque : 19 Nm (194 kgf-cm, 14 ft-lbf)

4. INSTALL VVT SENSOR Installation

5. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY Installation

6. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH Installation

7. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY Installation

8. INSTALL IGNITION COIL ASSEMBLY Installation

9. INSTALL INTAKE AIR SURGE TANK Installation

10. INSTALL OIL PAN SUB-ASSEMBLY Installation

11. INSTALL OIL STRAINER SUB-ASSEMBLY Installation

12. INSTALL NO.2 OIL PAN SUB-ASSEMBLY Installation

13. INSTALL CRANKSHAFT PULLEY Installation

14. INSTALL NO.1 IDLER PULLEY SUB-ASSEMBLY Installation

15. INSTALL NO.2 IDLER PULLEY DUB-ASSEMBLY Installation

16. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY Installation

17. INSTALL COOLER COMPRESSOR ASSEMBLY Installation

18. INSTALL GENERATOR ASSEMBLY Installation

19. INSTALL VANE PUMP ASSEMBLY Installation

20. INSTALL WATER INLET Installation

21. INSTALL OIL LEVEL GAUGE GUIDE

22. INSTALL AIR CLEANER ASSEMBLY Installation

23. INSTALL FAN SHROUD Installation

24. INSTALL RADIATOR SUPPORT TO FRAME SEAL LH

25. INSTALL FRONT DIFFERENTIAL CARRIER ASSEMBLY



26. INSTALL POWER STEERING LINK ASSEMBLY

Installation

27. INSTALL BATTERY

28. ADD ENGINE OIL Installation

29. ADD ENGINE COOLANT Service and Repair

30. ADD DIFFERENTIAL OIL (for 4WD)

31. INSPECT DIFFERENTIAL OIL (for 4WD) Adjustments

32. ADD POWER STEERING FLUID Power Steering System

33. BLEED POWER STEERING FLUID Power Steering System

34. CHECK FOR ENGINE OIL LEAKAGE

35. CHECK FOR ENGINE COOLANT LEAKAGE Service and Repair

36. CHECK FOR FUEL LEAKAGE

37. CHECK FOR EXHAUST GAS LEAKAGE

38. CHECK POWER STEERING FLUID LEAKAGE

39. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT

Service and Repair

40. INSTALL V-BANK COVER Installation

41. INSPECT IGNITION TIMING Engine

42. INSPECT ENGINE IDLING SPEED Engine

43. INSPECT COMPRESSION Engine

44. INSPECT CO/HC Engine