Installation
A750E AUTOMATIC TRANSMISSION: TRANSMISSION WIRE: INSTALLATION
1. INSTALL TRANSMISSION WIRE
(a) Install the transmission wire with the bolt.
Torque : 5.4 Nm (55 kgf-cm, 48 in-lbf)
(b) Connect the transmission wire connector.
2. CONNECT TRANSMISSION WIRE
(a) Connect the 7 connectors to the solenoid valves.
(b) Install the clamp with the bolt.
A - Torque : 10 Nm (100 kgf-cm, 7 ft-lbf)
B - Torque : 11 Nm (110 kgf-cm, 8 ft-lbf)
(c) Connect the ATF temperature sensor.
Wiring color:
a: Orange
b: Blue
3. INSTALL VALVE BODY OIL STRAINER ASSEMBLY Installation
4. INSTALL AUTOMATIC TRANSMISSION OIL PAN SUB-ASSEMBLY Installation
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque : 3.9 Nm (40 kgf-cm, 35 in-lbf)
6. PERFORM INITIALIZATION
A750F Automatic Transmission System
7. ADD AUTOMATIC TRANSMISSION FLUID
A750E Automatic Transmission