Operation CHARM: Car repair manuals for everyone.

Installation





3UR-FE CHARGING: GENERATOR: INSTALLATION

1. INSTALL GENERATOR ASSEMBLY

(a) Install the generator with the 3 bolts and nut.





Torque : 43 Nm (439 kgf-cm, 32 ft-lbf)

(b) Connect the generator connector.





(c) Connect the generator wire with the nut.

Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

(d) Install the terminal cap.

(e) Install the harness bracket to the generator with the bolt.

Torque : 31 Nm (316 kgf-cm, 23 ft-lbf)

2. CONNECT VANE PUMP ASSEMBLY Installation

3. INSTALL FRONT FENDER APRON SEAL RH

(a) Install the apron seal with the 5 clips.

4. INSTALL FAN & GENERATOR V BELT Installation

5. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY Replacement

6. INSTALL AIR CLEANER ASSEMBLY Installation

7. INSTALL AIR CLEANER HOSE ASSEMBLY Installation

8. INSTALL V-BANK COVER Installation

9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL