Operation CHARM: Car repair manuals for everyone.

B2271





THEFT DETERRENT / KEYLESS ENTRY: SMART KEY SYSTEM (for Start Function): B2271: Ignition Hold Monitor Malfunction
B2271 - Ignition Hold Monitor Malfunction

DESCRIPTION

This DTC is stored when a problem, such as an open in the AM2 fuse, an open or short in the wire harness between the fuse and power management control ECU, a short in the IG output circuit inside the power management control ECU, a short between the power management control ECU and relay, or a short in the relay, is detected.

HINT
When the power management control ECU is replaced with a new one and the cable is connected to the negative (-) battery terminal, the power source mode is reset to on (IG). When the battery is removed and reinstalled, the power source mode that was selected when the battery was removed is restored.





WIRING DIAGRAM





INSPECTION PROCEDURE

NOTICE:
* When using the Techstream with the engine switch off to troubleshoot: Connect the Techstream to the vehicle and turn a courtesy light switch on and off at 1.5 second intervals until communication between the Techstream and vehicle begins.
* Before performing the inspection, check that there are no problems related to the CAN communication system and LIN communication system.
* Inspect the fuses for circuits related to this system before performing the following inspection procedure.

PROCEDURE

1. CHECK HARNESS AND CONNECTOR (BATTERY - POWER MANAGEMENT CONTROL ECU)

(a) Disconnect the F80 power management control ECU connector.





(b) Measure the voltage according to the value(s) in the table below.

Standard Voltage:





Text in Illustration





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

2. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - BODY GROUND)

(a) Disconnect the F80 power management control ECU connector.

(b) Measure the resistance according to the value(s) in the table below.





Standard Resistance:





Text in Illustration





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

3. INSPECT NO. 1 INTEGRATION RELAY (IG2 RELAY)

(a) Remove the No. 1 integration relay.





(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





Text in Illustration





NG -- REPLACE NO. 1 INTEGRATION RELAY
OK -- Continue to next step.

4. INSPECT DRIVER SIDE JUNCTION BLOCK ASSEMBLY (IG1 NO. 1, IG1 NO. 2 AND IG1 NO. 3 RELAYS)

(a) Remove the driver side junction block assembly.





(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





Text in Illustration





NG -- REPLACE MAIN BODY ECU (DRIVER SIDE JUNCTION BLOCK ASSEMBLY)
OK -- Continue to next step.

5. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU - DRIVER SIDE JUNCTION BLOCK ASSEMBLY)

(a) Disconnect the F80 power management control ECU connector.

(b) Disconnect the 2C driver side junction block assembly connector.

(c) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

6. CHECK HARNESS AND CONNECTOR (DRIVER SIDE JUNCTION BLOCK ASSEMBLY - BODY GROUND)

(a) Disconnect the 2B driver side junction block assembly connector.

(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

7. CHECK HARNESS AND CONNECTOR (POWER MANAGEMENT CONTROL ECU -
NO. 1 INTEGRATION RELAY)

(a) Disconnect the F81 power management control ECU connector.

(b) Disconnect the 1C No. 1 integration relay connector.

(c) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

8. CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - BODY GROUND)

(a) Disconnect the 1C No. 1 integration relay connector.

(b) Measure the resistance according to the value(s) in the table below.

Standard Resistance:





NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.

9. CHECK POWER MANAGEMENT CONTROL ECU

(a) Install the No. 1 integration relay.

(b) Install the driver side junction block assembly.

(c) Connect the power management control ECU connectors.





Text in Illustration





(d) Measure the voltage according to the value(s) in the table below.

Standard Voltage:





NG -- REPLACE POWER MANAGEMENT CONTROL ECU Removal

OK -- USE SIMULATION METHOD TO CHECK How To Proceed With Troubleshooting