Operation CHARM: Car repair manuals for everyone.

Installation





2TR-FE LUBRICATION: OIL PUMP: INSTALLATION

1. INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL Replacement

2. INSTALL THERMOSTAT Installation

3. INSTALL WATER INLET Installation

4. INSTALL OIL PUMP





(a) Apply adhesive to the head straight screw plug.

Adhesive:

Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

(b) Using a 10 mm socket hexagon wrench, install the head straight screw plug.

Torque : 17 Nm (170 kgf-cm, 12 ft-lbf)

(c) Install 4 new O-rings onto the oil pump as shown in the illustration.





(d) Apply continuous beads of seal packing to the places shown in the illustration.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

Seal width::





NOTICE:
* Remove any oil from the contact surface.
* Install the chain cover within 3 minutes and tighten the bolts within 15 minutes of applying seal packing.
* Do not start the engine for at least 4 hours after installation.





(e) Align the oil pump's drive rotor spline and the crankshaft as shown in the illustration. Install the spline and chain cover onto the crankshaft.





(f) Loosely install the oil pump with the 19 bolts and 2 nuts, but do not tighten the bolts and nuts yet.

(g) Provisionally install the oil pump with the 19 bolts and 2 nuts.





NOTICE:
If the vehicle is equipped with air conditioning, install bolts A' and B' when installing the idle pulley with bracket since they are for this purpose.

HINT
Bolt length:

75 mm (2.95 in.) for bolt A, B

87 mm (3.43 in.) for bolt C

95 mm (3.74 in.) for bolt D

35 mm (1.37 in.) for bolt E

(h) Fully tighten the bolts and nuts, except bolts A, in the following order: Area 1, Area 3 and then Area 2.

Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)

(i) Fully tighten the bolts A in the following order: Area 2 and then Area 3.

Torque : 46 Nm (469 kgf-cm, 34 ft-lbf)

(j) Fully tighten the bolts E in Area 4.

Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)





(k) Install a new gasket, then install the water by-pass pipe No. 1 with the 2 nuts.





Torque : 18 Nm (178 kgf-cm, 13 ft-lbf)

5. INSTALL OIL PAN SUB-ASSEMBLY

6. INSTALL OIL STRAINER SUB-ASSEMBLY Installation

7. INSTALL OIL PAN SUB-ASSEMBLY NO.2 Installation

8. INSTALL OIL LEVEL GAGE SUB-ASSEMBLY

9. INSTALL CRANKSHAFT PULLEY Installation

10. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY Installation

11. INSTALL INTAKE MANIFOLD TO HEAD GASKET NO. 1 Installation

12. INSTALL CAMSHAFT POSITION SENSOR Installation

13. INSTALL CRANKSHAFT POSITION SENSOR Installation

14. INSTALL IDLE PULLEY ASSEMBLY W/BRACKET (w/ Air Conditioning System) Installation

15. INSTALL IDLER PULLEY SUB-ASSEMBLY NO.1 Installation

16. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY Installation

17. INSTALL GENERATOR ASSEMBLY Installation

18. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY Installation

19. INSTALL INTAKE AIR CONNECTOR Installation

20. INSTALL REAR END PLATE Installation

21. INSTALL DRIVE PLATE & RING GEAR SUB-ASSEMBLY (for Automatic Transmission) Installation

22. INSTALL FLYWHEEL SUB-ASSEMBLY (for Manual Transmission) Installation

23. INSTALL CLUTCH DISC ASSEMBLY (for Manual Transmission)





24. INSTALL CLUTCH COVER ASSEMBLY (for Manual Transmission)





25. INSTALL ENGINE ASSEMBLY Installation

26. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY (for Automatic Transmission)





27. INSTALL MANUAL TRANSMISSION UNIT ASSEMBLY (for Manual Transmission)





28. INSTALL EXHAUST PIPE ASSEMBLY FRONT Installation

29. INSTALL EXHAUST PIPE ASSEMBLY TAIL Installation

30. CONNECT ENGINE WIRE

31. CONNECT AIR INJECTION SYSTEM NO.1 HOSE Installation

32. CONNECT FUEL VAPOR FEED HOSE ASSEMBLY Installation

33. CONNECT FUEL HOSE NO.2 Installation

34. CONNECT FUEL HOSE Installation

35. INSTALL WATER HOSE SUB-ASSEMBLY Installation

36. INSTALL RADIATOR HOSE INLET

37. INSTALL COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning System) Installation

38. INSTALL RADIATOR HOSE NO.2

39. INSTALL VANE PUMP ASSEMBLY Installation

40. INSTALL AIR CLEANER CASE

(a) Install the air cleaner case with the 3 bolts.

Torque : 12 Nm (122 kgf-cm, 9 ft-lbf)

41. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

42. INSTALL AIR CLEANER CAP SUB-ASSEMBLY Installation

43. INSTALL FAN SHROUD Installation

44. INSTALL RADIATOR SUPPORT TO FRAME SEAL LH Installation

45. INSTALL BATTERY TRAY

46. INSTALL BATTERY

47. ADD ENGINE OIL Installation

48. ADD ENGINE COOLANT Service and Repair

49. CHECK ENGINE OIL LEVEL

50. CHECK FUEL LEAK

51. CHECK ENGINE COOLANT LEAKAGE Testing and Inspection

52. CHECK OIL LEAKAGE

53. CHECK EXHAUST GAS LEAKAGE

54. INSTALL ENGINE UNDER COVER SUB-ASSEMBLY NO.1 (for Pre Runner and 4WD Type)

(a) Install the engine under cover No. 1 with the 4 bolts.

Torque : 30 Nm (306 kgf-cm, 22 ft-lbf)

55. INSTALL ENGINE UNDER COVER SUB-ASSEMBLY NO.2 (for Pre Runner and 4WD Type, Regular Cab)

(a) Install the engine under cover No. 2 with the 4 bolts.

Torque : 30 Nm (306 kgf-cm, 22 ft-lbf)

56. INSTALL HOOD SUB-ASSEMBLY

Reassembly