Installation
1GR-FE EXHAUST: EXHAUST MANIFOLD: INSTALLATION
1. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH
Install a new gasket to the cylinder head.
Text in Illustration
NOTICE:
Be careful of the installation direction.
Temporarily install the manifold with the new nut labeled 1.
(a) Install the remaining 5 new nuts and tighten the nuts in the sequence shown in the illustration.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
2. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
(a) Install the heat insulator with the 3 bolts.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
3. INSTALL NO. 2 AIR TUBE Installation
4. INSTALL MANIFOLD STAY
(a) Install the manifold stay with the 3 bolts.
Torque : 40 Nm (408 kgf-cm, 30 ft-lbf)
5. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH
Install a new gasket to the cylinder head.
Text in Illustration
NOTICE:
Be careful of the installation direction.
Temporarily install the manifold with the new nut labeled 1.
(a) Install the remaining 5 new nuts and tighten the nuts in the sequence shown in the illustration.
Torque : 21 Nm (214 kgf-cm, 15 ft-lbf)
6. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
(a) Install the heat insulator with the 3 bolts.
Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)
7. INSTALL AIR TUBE Installation
8. INSTALL NO. 2 MANIFOLD STAY
(a) Install the manifold stay with the 3 bolts.
Torque : 40 Nm (408 kgf-cm, 30 ft-lbf)
(b) Connect the wire harness connector.
9. INSTALL FRONT FENDER APRON SEAL REAR RH Installation
10. INSTALL FRONT FENDER APRON SEAL REAR LH Installation
11. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation
12. INSTALL AIR CLEANER CAP AND HOSE Installation
13. INSTALL NO. 1 ENGINE UNDER COVER Replacement
14. INSTALL FRONT EXHAUST PIPE ASSEMBLY
except Regular Cab Standard Deck: Installation
for Regular Cab Standard Deck: Installation