Operation CHARM: Car repair manuals for everyone.

Installation





1GR-FE ENGINE MECHANICAL: ENGINE ASSEMBLY: INSTALLATION

1. INSTALL FRONT NO. 2 ENGINE MOUNTING BRACKET LH

(a) Install the front No. 2 engine mounting bracket LH with the bolt.

Torque : 32 Nm (326 kgf-cm, 24 ft-lbf)

2. INSTALL ENGINE HANGER

(a) Install 2 engine hangers with 4 bolts as shown in the illustration.





Torque : 33 Nm (337 kgf-cm, 24 ft-lbf)

Text in Illustration





HINT






3. REMOVE ENGINE FROM ENGINE STAND

(a) Attach an engine sling device and hang the engine with a chain block.

(b) Lift the engine and remove it from the engine stand.

NOTICE:
* With the exception of installing the engine assembly to an engine stand or removing the engine assembly from an engine stand, do not perform any work on the engine while it is suspended, as doing so is dangerous.
* Pay attention to the angle of the sling device as the engine assembly or engine hangers may be damaged or deformed if the angle is incorrect.

4. INSTALL ENGINE ASSEMBLY

(a) Slowly lower the engine into the engine compartment.





Install the front engine mounting insulator LH with the nut and 2 bolts.

for nut - Torque : 72 Nm (734 kgf-cm, 53 ft-lbf)

for bolt - Torque : 79 Nm (806 kgf-cm, 58 ft-lbf)

Text in Illustration





(b) Install the front engine mounting insulator RH with the nut and 2 bolts.

for nut - Torque : 72 Nm (734 kgf-cm, 53 ft-lbf)

for bolt - Torque : 79 Nm (806 kgf-cm, 58 ft-lbf)

(c) Remove the 2 engine hangers and 4 bolts.

5. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY





Using SST, hold the crankshaft.

SST : 09213-54015

91651-60855

SST : 09330-00021





Install the front spacer, drive plate and rear spacer to the crankshaft.

Text in Illustration





HINT
As the front spacer, the drive plate and ring gear and the rear spacer are not reversible, be sure to install them so that they are facing in the direction shown in the illustration.

(a) Clean the bolts and bolt holes.





Apply adhesive to 2 or 3 threads at the end of each of the 8 bolts.

Adhesive:

Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

Text in Illustration









Install and uniformly tighten the 8 bolts in several steps in the sequence shown in the illustration.

Torque : 83 Nm (846 kgf-cm, 61 ft-lbf)

NOTICE:
Do not start the engine for at least 1 hour after installation.

6. INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR

HINT
Only perform this procedure when replacement of the engine mounting insulator is necessary.

(a) Install the rear engine mounting insulator to the transmission with the 4 bolts.

Torque : 40 Nm (408 kgf-cm, 30 ft-lbf)

7. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY

Installation

8. INSTALL PROPELLER SHAFT ASSEMBLY

Installation

9. CONNECT NO. 1 AND NO. 2 FUEL PIPES

(a) Connect the No. 1 and No. 2 fuel pipes Service Precautions.

(b) Install the No. 2 fuel pipe clamp to the fuel tube connector.

10. CONNECT HEATER WATER HOSE ASSEMBLY





Connect the heater water inlet and outlet hoses.

Text in Illustration





HINT
The direction of the hose clamp is indicated in the illustration.

(a) Attach the wire harness clamp.

11. CONNECT COOLER COMPRESSOR ASSEMBLY

(a) Install the cooler compressor with the 2 stud bolts.

Torque : 10 Nm (102 kgf-cm, 7 ft-lbf)





Install the 2 bolts and 2 nuts.

Torque : 25 Nm (250 kgf-cm, 18 ft-lbf)

HINT
Tighten the bolts and nuts in the order shown in the illustration to install the cooler compressor.

(b) Connect the cooler compressor connector.

12. CONNECT ENGINE WIRE

(a) Attach the 2 claws and connect the 2 connectors to connect the engine room junction block connector to the engine room junction block.

(b) Attach the claw and install the bolt to connect the engine wire harness.

Torque : 17 Nm (173 kgf-cm, 13 ft-lbf)

(c) Attach the clamp and connect the air pump connector.

(d) Install the ground cable with the 2 bolts.

Torque : 8.4 Nm (86 kgf-cm, 74 in-lbf)

(e) Attach the clamp and connect the ECM connector Installation.

(f) Attach the 2 clamps and connect the 7 connectors to connect the junction block connector to the junction block.

(g) Install the junction block cover.

(h) Attach the 2 wire harness clamps.

(i) Connect the 2 air injection control driver connectors.

13. INSTALL DRIVE PLATE AND TORQUE CONVERTER SETTING BOLT Installation

14. INSTALL STARTER ASSEMBLY (for 1.6 kW Type) Installation

15. INSTALL STARTER ASSEMBLY (for 1.4 kW Type) Installation

16. INSTALL STARTER COVER (for 1.4 kW Type) Installation

17. INSTALL GENERATOR ASSEMBLY Installation

18. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH Installation

19. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR Installation

20. INSTALL NO. 2 AIR TUBE Installation

21. INSTALL MANIFOLD STAY Installation

22. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH Installation

23. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR Installation

24. INSTALL AIR TUBE Installation

25. INSTALL NO. 2 MANIFOLD STAY Installation

26. INSTALL FRONT EXHAUST PIPE ASSEMBLY

(a) Install a new gasket and the exhaust pipe to the exhaust manifold RH with 3 new nuts.

Torque : 54 Nm (551 kgf-cm, 40 ft-lbf)

(b) Install a new gasket and the exhaust pipe to the center exhaust pipe with the 2 bolts.

Torque : 48 Nm (489 kgf-cm, 35 ft-lbf)

(c) Connect the air fuel ratio sensor connector.

(d) Connect the heated oxygen sensor connector and attach the 2 clamps.

27. INSTALL FRONT NO. 2 EXHAUST PIPE ASSEMBLY (except Regular Cab Standard Deck)

(a) Connect the front No. 2 exhaust pipe to the exhaust pipe support.

(b) Install a new gasket and the front No. 2 exhaust pipe to the exhaust manifold LH with 3 new nuts.

Torque : 54 Nm (551 kgf-cm, 40 ft-lbf)

(c) Install a new gasket and the front No. 2 exhaust pipe to the center exhaust pipe with the 2 bolts.

Torque : 48 Nm (489 kgf-cm, 35 ft-lbf)

(d) Connect the air fuel ratio sensor connector.

(e) Connect the heated oxygen sensor connector.

28. INSTALL FRONT NO. 2 EXHAUST PIPE ASSEMBLY (for Regular Cab Standard Deck)

(a) Install a new gasket and the front No. 2 exhaust pipe to the exhaust manifold LH with 3 new nuts.

Torque : 54 Nm (551 kgf-cm, 40 ft-lbf)

(b) Connect the air fuel ratio sensor connector.

(c) Connect the heated oxygen sensor connector and attach the 2 clamps.

29. INSTALL FRONT NO. 3 EXHAUST PIPE SUB-ASSEMBLY (for Regular Cab Standard Deck)

(a) Install a new gasket to the front No. 2 exhaust pipe.

(b) Install a new gasket to the front No. 3 exhaust pipe.

(c) Connect the front No. 3 exhaust pipe to the exhaust pipe support.

(d) Install the front No. 3 exhaust pipe with the 4 bolts and 2 new nuts.

Torque : 48 Nm (489 kgf-cm, 35 ft-lbf)

30. CONNECT VANE PUMP ASSEMBLY Installation

31. INSTALL FAN AND GENERATOR V BELT Installation

32. INSTALL INTAKE AIR SURGE TANK Installation

33. INSTALL AIR TUBE ASSEMBLY Installation

34. INSTALL RADIATOR ASSEMBLY Installation

35. INSTALL FAN SHROUD Installation

36. INSTALL RADIATOR HOSE OUTLET Installation

37. INSTALL RADIATOR HOSE INLET Installation

38. INSTALL AIR CLEANER CASE SUB-ASSEMBLY Installation

39. INSTALL AIR CLEANER CAP AND HOSE Installation

40. ADD ENGINE COOLANT Service and Repair

41. ADD ENGINE OIL Replacement

42. INSTALL FRONT COWL TOP OUTER PANEL SUB-ASSEMBLY Installation

43. INSTALL FRONT WIPER MOTOR AND LINK ASSEMBLY

Installation

44. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.

45. INSPECT FOR FUEL LEAK Installation

46. INSPECT FOR ENGINE OIL LEAK Replacement

47. INSPECT FOR EXHAUST GAS LEAK Installation

48. CHECK ENGINE OIL LEVEL Testing and Inspection

49. INSTALL FRONT FENDER APRON SEAL REAR RH

(a) Install the fender apron seal with the 5 clips.

50. INSTALL FRONT FENDER APRON SEAL REAR LH

(a) Install the fender apron seal with the 5 clips.

51. INSTALL FRONT FENDER APRON SEAL RH

(a) Install the front fender apron seal with the 6 clips.

52. INSTALL FRONT FENDER APRON SEAL LH

(a) Install the front fender apron seal with the 6 clips.

53. INSTALL NO. 1 ENGINE UNDER COVER Replacement

54. PERFORM RESET MEMORY

Programming and Relearning

55. INSPECT IGNITION TIMING Engine

56. INSPECT ENGINE IDLE SPEED Engine

57. INSPECT CO/HC Engine

58. INSTALL HOOD SUB-ASSEMBLY

(a) Install the hood with the 4 bolts and 2 clips.

Torque : 13 Nm (133 kgf-cm, 10 ft-lbf)

59. ADJUST HOOD SUB-ASSEMBLY Adjustments