Operation CHARM: Car repair manuals for everyone.

Installation





1GR-FE CHARGING: GENERATOR: INSTALLATION

1. INSTALL GENERATOR ASSEMBLY

(a) Install the generator bracket to the generator with the bolt.

Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)

(b) Install the generator with the 2 bolts.

Torque : 43 Nm (438 kgf-cm, 32 ft-lbf)

(c) Install the generator bracket with the bolt.

Torque : 20 Nm (204 kgf-cm, 15 ft-lbf)

(d) Attach the wire harness clamp.

(e) Connect the wire harness bracket with the bolt.

Torque : 8.0 Nm (82 kgf-cm, 71 in-lbf)

(f) Connect the generator connector to the generator.

(g) Install the generator wire with the nut.

Torque : 9.8 Nm (100 kgf-cm, 87 in-lbf)

(h) Close the terminal cap.

2. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR Installation

3. INSTALL FRONT FENDER APRON SEAL REAR LH Installation

4. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY

(a) for Integrated Type:

Install the No. 2 idler pulley with the bolt.

Torque : 54 Nm (551 kgf-cm, 40 ft-lbf)

(b) for Separate Type:

Install the idler pulley cover plate, No. 2 idler pulley and No. 2 idler pulley cover plate with the bolt.

Torque : 54 Nm (551 kgf-cm, 40 ft-lbf)

5. INSTALL FAN AND GENERATOR V BELT Installation

6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.